data center features

Designed, constructed and operated with near Tier IV electrical attributes, Tier III mechanicals and as a LEED Gold certified facility.

POWER

  • Twin 10 Megawatt (MW) utility power feeds at 26,400 volts primary service

  • Diverse power feeds are active 100% of the time

  • No loss of power on either feed to the data center has occurred since inception of the business

  • A and B source power circuit delivery capabilities

  • 5 MW backup diesel power generation expandable to 7.5 MWs

  • Automatic Transfer Switches (ATS)

  • Twin 6,000 kVA UPS system capacity, and twin UPS & electrical rooms

  • Redundant battery strings within UPS and generator

  • Multiple redundant power distribution paths

  • JCI Metasys Building Automation System

SPACE

  • Highly scalable facility in space, power and cooling

  • Both private cage space and private suites available

  • 15,000 sq ft of data center space currently available, with the ability to expand

  • 30,000 sq ft of data center space expansion available

COOLING

  • 800 tons of redundant cooling capacity, expandable to 2,000 tons

  • Anti-static raised flooring with designated cable runs and cooled air delivery

  • Hot aisle/cold aisle configuration has the ability to cool cabinets from 5kW to 25 kW of power demand

  • No additional active or passive cooling, or containment required at levels of 13kW and below

  • Passive or active chimney containment recommended in requirements of 13kW – 25kW

Connectivity

  • Carrier neutral — we can support almost any carrier of your preference for your connection needs.

PUE

  • Data center design of 1.28 with contracted contract cap rates at 1.5

Sustainability

The Data Holding Data Center has achieved LEED Gold Certification according to the US Green Building Council. The project was seeking Silver, but exceeded expectations and achieved Gold.

SUSTAINABLE FEATURES:

  • York Chillers with Fisen airside economizers for Free Cooling below 60 degrees

  • White PVC Roofing – Heat Island Effect

  • Parking Stalls for Low-emitting / Fuel Efficient Vehicles

  • Measurement and verification – All Electrical Panels are metered internally

  • 30% + regional materials

  • 20% recycled content

  • 75% of waste diverted from landfills